Close Menu
Voxa News

    Subscribe to Updates

    Get the latest creative news from FooBar about art, design and business.

    What's Hot

    The Ultimate Fantasy Football Cheat Sheet: picks, busts, more

    August 9, 2025

    Targeted by the right, Britain’s asylum hotels are places of fear and disorder. Bad political decisions made it so | Daniel Trilling

    August 9, 2025

    Intel CEO responds to ‘misinformation’ and Trump threat in letter

    August 9, 2025
    Facebook X (Twitter) Instagram
    Voxa News
    Trending
    • The Ultimate Fantasy Football Cheat Sheet: picks, busts, more
    • Targeted by the right, Britain’s asylum hotels are places of fear and disorder. Bad political decisions made it so | Daniel Trilling
    • Intel CEO responds to ‘misinformation’ and Trump threat in letter
    • From chilli-spiked watermelon to a DIY Aperol spritz bar: what top chefs bring to a barbecue | Barbecue
    • Far-right protesters clash with police in Nuneaton after rally outside town hall | UK news
    • Hornsea uniform swap gets bigger venue due to popularity
    • South Korea postpones decision to let Google Maps work properly – again | South Korea
    • Lorna Rose Treen: 24 Hour Diner People review – ‘best joke of the fringe’ winner serves up silliness | Edinburgh festival 2025
    Saturday, August 9
    • Home
    • Business
    • Health
    • Lifestyle
    • Politics
    • Science
    • Sports
    • Travel
    • World
    • Entertainment
    • Technology
    Voxa News
    Home»Science»NASA Lunar Reactor Directive – The New York Times
    Science

    NASA Lunar Reactor Directive – The New York Times

    By Olivia CarterAugust 7, 2025No Comments3 Mins Read0 Views
    Facebook Twitter Pinterest LinkedIn Telegram Tumblr Email
    NASA Lunar Reactor Directive - The New York Times
    Share
    Facebook Twitter LinkedIn Pinterest Email

    Actions to NASA OICS:

    •

    •

    .

    •

    Within 30 days of this directive, the Associate Administrator (AA) for the Exploration Systems Development Mission Directorate (ESDMD) shall designate a Fission Surface Power Program Executive, who will serve as the empowered and accountable official for end-to-end execution of the FSP effort, including procurement, technology integration, interagency coordination, and performance oversight. The FSP PE is empowered to provide reporting and updates with maximum transparency directly to the Administrator.

    Within 60 days of this directive, ESDMD shall issue a new procurement Request for Proposal (RFP) to industry.
    The Space Technology Mission Directorate (STMD) shall immediately cease any new FSP technology maturation efforts that don’t support the RFP and align available FY25 funding to support the RFP initial award amount.
    ESDMD, through the FSP PE, shall lead the program with support from Office of General Counsel and Office of Procurement. The FSP project shall not exceed 15 Full time engineer equivalents on a yearly basis and a maximum of 10% overhead cost to manage. The project shall adopt a minimum viable structure (MVS) for its management team, composed of essential civil servant roles and supported by flexible, targeted contractor expertise. This structure shall prioritize agility, reduce duplication, and focus on milestone-driven delivery.
    The Partnerships Office is excused from participating in the management and execution of the Space Act Agreement.

    This Fission surface power RFP shall feature:

    •

    •

    •

    •

    The ability to award to two providers within six months of the release of the RFP with the option to down-select to one provider at PDR
    Flexibility to industry provider in extent of demonstration capability

    Minimum 100kWe power output

    Assumed use of a heavy class lander (up to 15 metric tons mass available)
    о Readiness to launch by the first quarter of FY30
    A closed Brayton cycle power conversion system to reduce risk and ensure

    extensibility to higher power systems

    NASA’s funded Space Act Authority (SAA) to grant maximum flexibility to industry
    in how to efficiently design and develop FSP flight systems
    Completion of an operational space flight system and an option for continued

    sustainment support

    Flexibility to NASA to award contract value based on proposed industry capability, potential industry cost-sharing (i.e., in exchange for industry owning and operating
    the reactor power once operational), and availability of funds
    Payments via milestones with no less than 25% of the total contract value paid after the successful checkout and delivery of the FSP flight system.

    Directive Lunar NASA reactor times York
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
    Olivia Carter
    • Website

    Olivia Carter is a staff writer at Verda Post, covering human interest stories, lifestyle features, and community news. Her storytelling captures the voices and issues that shape everyday life.

    Related Posts

    ‘Bizarre and wrong’: Danish zoo sparks debate with plea for pets to use as food | Animals

    August 9, 2025

    Pfizer Covid vaccine for young children may not be renewed by FDA | US news

    August 9, 2025

    Congressman Eric Sorensen on Defending Climate Science, Depoliticizing Weather and Bringing Scientific Rigor to Capitol Hill

    August 9, 2025

    Eight bat researchers mostly from Asia and Africa refused entry into Australia to attend global scientific event | Science

    August 9, 2025

    AI-Designed Hydrogel Inspired by Nature Creates Ultra-Strong Underwater Adhesive

    August 8, 2025

    Jim Lovell, Apollo 13 commander, dies aged 97 | Nasa

    August 8, 2025
    Leave A Reply Cancel Reply

    Medium Rectangle Ad
    Top Posts

    27 NFL draft picks remain unsigned, including 26 second-rounders and Bengals’ Shemar Stewart

    July 17, 20251 Views

    Eight healthy babies born after IVF using DNA from three people | Science

    July 17, 20251 Views

    Massive Attack announce alliance of musicians speaking out over Gaza | Kneecap

    July 17, 20251 Views
    Don't Miss

    The Ultimate Fantasy Football Cheat Sheet: picks, busts, more

    August 9, 2025

    It’s hard to beat fantasy football season, but it can also be tough to read…

    Targeted by the right, Britain’s asylum hotels are places of fear and disorder. Bad political decisions made it so | Daniel Trilling

    August 9, 2025

    Intel CEO responds to ‘misinformation’ and Trump threat in letter

    August 9, 2025

    From chilli-spiked watermelon to a DIY Aperol spritz bar: what top chefs bring to a barbecue | Barbecue

    August 9, 2025
    Stay In Touch
    • Facebook
    • YouTube
    • TikTok
    • WhatsApp
    • Twitter
    • Instagram
    Latest Reviews
    Medium Rectangle Ad
    Most Popular

    27 NFL draft picks remain unsigned, including 26 second-rounders and Bengals’ Shemar Stewart

    July 17, 20251 Views

    Eight healthy babies born after IVF using DNA from three people | Science

    July 17, 20251 Views

    Massive Attack announce alliance of musicians speaking out over Gaza | Kneecap

    July 17, 20251 Views
    Our Picks

    As a carer, I’m not special – but sometimes I need to be reminded how important my role is | Natasha Sholl

    June 27, 2025

    Anna Wintour steps back as US Vogue’s editor-in-chief

    June 27, 2025

    Elon Musk reportedly fired a key Tesla executive following another month of flagging sales

    June 27, 2025
    Recent Posts
    • The Ultimate Fantasy Football Cheat Sheet: picks, busts, more
    • Targeted by the right, Britain’s asylum hotels are places of fear and disorder. Bad political decisions made it so | Daniel Trilling
    • Intel CEO responds to ‘misinformation’ and Trump threat in letter
    • From chilli-spiked watermelon to a DIY Aperol spritz bar: what top chefs bring to a barbecue | Barbecue
    • Far-right protesters clash with police in Nuneaton after rally outside town hall | UK news
    • About Us
    • Disclaimer
    • Get In Touch
    • Privacy Policy
    • Terms and Conditions
    2025 Voxa News. All rights reserved.

    Type above and press Enter to search. Press Esc to cancel.